CONSTRUCTION METHOD OF TUNNEL
PROBLEM TO BE SOLVED: To improve execution by constructing a ceiling part and a floor part by a shield tunnel with an underground wall as a side wall, and excavating the inside of an outer shell connecting these. SOLUTION: In the case where a large cross section tunnel is constructed, a substantiall...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English |
Published |
26.01.1999
|
Edition | 6 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!