MANUFACTURE OF SQUARE STEEL TUBE OF HIGH STRENGTH

PROBLEM TO BE SOLVED: To improve the productivity and to reduce the manufacturing cost by installing a heating device on a square steel tube manufacturing line, and performing the stress relieving annealing of the square steel tube to continuously manufacture the square steel tube of high strength....

Full description

Saved in:
Bibliographic Details
Main Authors SAKAGAMI TAKEHIKO, MIURA TAKAO, IWASAKI TOSHIO, TAKACHI TSUTOMU, OBATA MASAAKI
Format Patent
LanguageEnglish
Published 17.06.1997
Edition6
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PROBLEM TO BE SOLVED: To improve the productivity and to reduce the manufacturing cost by installing a heating device on a square steel tube manufacturing line, and performing the stress relieving annealing of the square steel tube to continuously manufacture the square steel tube of high strength. SOLUTION: An electric welding equipment 4 is provided rearward of a forming equipment 1, and each side edge of a steel plate 2 is electrically welded to manufacture a steel tube 5. A heating device 9 to perform the stress relieving annealing of the square steel tube 6 is provided rearward of a corner forming device 7, and the productivity is improved by continuously performing the stress relieving annealing in a square steel tube manufacturing line. In addition, a galvanizing equipment 10 is installed rearward of the heating device 9, and the productivity is improved because the galvanizing can be continuously performed in the square steel tube manufacturing line.
Bibliography:Application Number: JP19950312232