METHOD FOR CONSTRUCTING CONCRETE ROOF
PURPOSE: To reduce construction period and cost by securing roof skeletons to the tops of side walls, and arranging and fixing segments on the roof skeletons. CONSTITUTION: An underground continuous wall 5 is constructed in a cylindrical shape inside the ground. The inside of the underground continu...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | English |
Published |
02.07.1996
|
Edition | 6 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PURPOSE: To reduce construction period and cost by securing roof skeletons to the tops of side walls, and arranging and fixing segments on the roof skeletons. CONSTITUTION: An underground continuous wall 5 is constructed in a cylindrical shape inside the ground. The inside of the underground continuous wall 5 is drilled and a bottom plate and side walls 9 made of reinforced concrete are constructed. Then roof skeletons 1 are assembled above the bottom plate. Segments 11 are then arranged on the roof skeletons 1 and held in plate. Thus, without employing any support, construction period is greatly reduced, and costs can be reduced. |
---|---|
Bibliography: | Application Number: JP19940334214 |