CONVERTER STEELMAKING PLANT
PURPOSE:To reduce the cycle time related to a preliminary treating furnace in a converter steelmaking plant. CONSTITUTION:In this converter steelmaking plant, the preliminary treating furnace 10 and a decarburizing furnace 11 are provided. Further, a molten iron hanging-up pouring device 12 arranged...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English |
Published |
15.11.1994
|
Edition | 5 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PURPOSE:To reduce the cycle time related to a preliminary treating furnace in a converter steelmaking plant. CONSTITUTION:In this converter steelmaking plant, the preliminary treating furnace 10 and a decarburizing furnace 11 are provided. Further, a molten iron hanging-up pouring device 12 arranged on the molten iron pouring side of the molten iron preliminary treating furnace 10, a molten iron receiving device 13, 18 arranged on the molten iron tapping side of the molten iron preliminary treating furnace 10, a molten iron hanging-up pouring device 14 and a molten steel receiving device 15 arranged on the molten steel tapping side of the decarburizing furnace 11 are provided by combining these devices. |
---|---|
Bibliography: | Application Number: JP19930104237 |