UNDERGROUND CONTINUOUS WALL AND EXECUTION METHOD THEREFOR
PURPOSE:To simplify an execution method, save work space and improve safety by ensuring enough strength through the bending rigidity of a steel sheet pile, instead of a reinforcement, and effectively preventing the collapse of the pile with the rigidity thereof at the time of excavation. CONSTITUTIO...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
08.01.1993
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PURPOSE:To simplify an execution method, save work space and improve safety by ensuring enough strength through the bending rigidity of a steel sheet pile, instead of a reinforcement, and effectively preventing the collapse of the pile with the rigidity thereof at the time of excavation. CONSTITUTION:Adjacent steel sheet piles 1, while being jointed to each other, are arrayed, and respectively driven or pressed into subsoil down to a bearing layer 6. Then, the subsoil inside the piles 1 is excavated, and concrete 2 is applied to an excavated area, thereby forming an underground continuous wall having the piles 1 as a hull body. |
---|---|
Bibliography: | Application Number: JP19910178821 |