PREVENTIVE MAINTENANCE METHOD FOR USING PARTS OF INJECTION MOLDING MACHINE

PURPOSE:To enable systematic production, by a method wherein replacing of using parts is performed at the time in consideration of a necessary procurement time for the using parts through a machine working lapse time when a process quantity which is a limit value where whether a good product can be...

Full description

Saved in:
Bibliographic Details
Main Author KUMAZAKI HIROSHI
Format Patent
LanguageEnglish
Published 28.05.1993
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PURPOSE:To enable systematic production, by a method wherein replacing of using parts is performed at the time in consideration of a necessary procurement time for the using parts through a machine working lapse time when a process quantity which is a limit value where whether a good product can be produced or not and that of a cycle time in terms of production efficiency is attained. CONSTITUTION:When a process quantity and a machine working lapse time are made respectively Q and t, a machine working lapse time t1 is calculated by a relative formula Q=f(t) obtained by an experimental value or a production of Q/ t at a certain time T and a process quantity Q1 which is a limit value where whether or not a good product can be produced and that of a cycle time in terms of production efficiency and replacing of using parts is performed at a warning value Q2 of the process quantity which is (t1-t2) from a machine operation working starting time obtained by going back by a necessary procurement time t2 for using parts of repairing object part.
Bibliography:Application Number: JP19910322532