EXECUTION METHOD OF POST STEEL ANCHOR SECTION
PURPOSE:To shorten the terms of work up to steel erection after the execution of a floor slab by preparing a post steel anchor section while being separated from wall body construction. CONSTITUTION:In the execution method of post steel anchor sections 5, 5a in the house of steel structure or steel...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | English |
Published |
24.12.1992
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PURPOSE:To shorten the terms of work up to steel erection after the execution of a floor slab by preparing a post steel anchor section while being separated from wall body construction. CONSTITUTION:In the execution method of post steel anchor sections 5, 5a in the house of steel structure or steel reinforcement structure with the post steel anchor sections 5a, 5a erected from a floor slab 2 and unified with a body wall, the floor slab 2 is executed, and cylindrical anchor frames 10 are installed onto the floor slab 2. Concrete is placed into the anchor frames 10 apart from wall body construction, and cured. |
---|---|
Bibliography: | Application Number: JP19910176157 |