CONSTRUCTION METHOD OF INSPECTION GALLERY FOR DAM
PURPOSE:To make it possible to construct an inspection gallery with a little manpower in a short period of time by connecting inspection galley connection units in succession to the formation level of an inspection galley for a dam in a dam body. CONSTITUTION:Base plates 1 are welded to insertion re...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | English |
Published |
24.06.1991
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PURPOSE:To make it possible to construct an inspection gallery with a little manpower in a short period of time by connecting inspection galley connection units in succession to the formation level of an inspection galley for a dam in a dam body. CONSTITUTION:Base plates 1 are welded to insertion reinforcements (b) projecting parallelly to the formation level (a) in the dam body A of a dam. After that, a bearing body 2, in which the lower parts of the base plates 1 are buried, is so driven that the surface 2a of the baring body comes to a lower side than the tops 1a of the base plates 1 by using mortar. Then, inspection galley connection units 3 are suspended on the base plates 1 by a crane and they are continuously pulled nearer each other. Fitting projections 4 of the units 3 are fitted in fitting recesses 5 of adjacent units 3. In addition, coupling bolts are inserted into insertion holes of coupling members 7 in the external edge of the upper wall and the internal edge of the bottom wall from the insides of the units 3, and the coupling members 7 are clamped while pulling the units 3 nearer to construct an inspection galley B. |
---|---|
Bibliography: | Application Number: JP19890284938 |