BASE ISOLATION STRUCTURE
To provide a base isolation structure capable of reducing additional bending moment generated at a pile head due to horizontal deformation of a base isolation device.SOLUTION: A base isolation structure has a plurality of pile bodies 2, a first upper footing 311 (upper foundation) of an upper struct...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
18.04.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | To provide a base isolation structure capable of reducing additional bending moment generated at a pile head due to horizontal deformation of a base isolation device.SOLUTION: A base isolation structure has a plurality of pile bodies 2, a first upper footing 311 (upper foundation) of an upper structure capable of being relatively displaced to the pile body 2 in a horizontal direction, a first steel girder 71 that extends in a first horizontal direction and is installed on the first upper footings 311 adjacent in the first horizontal direction, a second steel girder 72 that extends in a second horizontal direction and is installed on the first upper footings 311 adjacent in the second horizontal direction, and a sliding bearing 4 disposed between the plurality of pile bodies 2 and the first upper footings 311. The first upper footing 311 is disposed at an intersection between the first steel girder 71 and the second steel girder 72 and has a steel angle brace 8 (load support beam), which is disposed to surround the intersection, connected to the first steel girder 71 and the second steel girder 72, and reinforces the first upper footing 311, and concrete 313 to embed the intersection and the steel angle brace 8.SELECTED DRAWING: Figure 3
【課題】免震装置の水平変形によって杭頭に生じる付加曲げモーメントを低減できる免震構造を提供する。【解決手段】複数の杭体2と、杭体2と水平方向に相対変位可能な上部構造体の第1上部フーチング311(上部基礎)と、第1水平方向に延び第1水平方向に隣接する第1上部フーチング311に架設される第1鉄骨大梁71と、第2水平方向に延び第2水平方向に隣接する第1上部フーチング311に架設される第2鉄骨大梁72と、複数の杭体2と第1上部フーチング311との間に設けられるすべり支承4と、を有し、第1上部フーチング311は、第1鉄骨大梁71と第2鉄骨大梁72との交差部に配置され、交差部を囲むように配置され第1鉄骨大梁71および第2鉄骨大梁72と接合され第1上部フーチング311を補強する鉄骨火打梁8(荷重支持梁)と、交差部および鉄骨火打梁8を埋設するコンクリート313と、を有する。【選択図】図3 |
---|---|
Bibliography: | Application Number: JP20230191772 |