FLOOR BEAM RECEIVING MATERIAL, AND CONNECTION STRUCTURE OF FLOOR BEAM WITH FOUNDATION

To provide a floor receiving material for canceling concentration of anchor bolts on the top end face of foundation, and a connection structure of the floor beam with the foundation.SOLUTION: A floor receiving material 30 connects a floor beam 50 to foundation 10, while supporting the floor beam 50...

Full description

Saved in:
Bibliographic Details
Main Authors FUJIYAMA SEIJI, BABA MINEO
Format Patent
LanguageEnglish
Japanese
Published 13.10.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:To provide a floor receiving material for canceling concentration of anchor bolts on the top end face of foundation, and a connection structure of the floor beam with the foundation.SOLUTION: A floor receiving material 30 connects a floor beam 50 to foundation 10, while supporting the floor beam 50 of a steel structure, and has an abutting piece 31 abutting on a side face 12 of the foundation 10, locking pieces 32 extended to the foundation 10 side from a back face of the abutting piece 31 and locked to a top end 11 of the foundation 10, and a support piece 33 extended to an opposite side of the foundation 10 from a front face of the abutting piece 31 to support the floor beam 50. First bolt holes 34 are opened to the abutting piece 31, and the abutting piece 31 is fixed to the side face 12 via first bolts 41 inserted into the first bolt holes 34. Second bolt holes 35 are opened to the support piece 33, and positioned with a third bolt hole 52 of the floor beam 50 of the steel structure, and the support piece 33 and the floor beam 50 are fixed via second bolts 42 inserted into both bolt holes.SELECTED DRAWING: Figure 1 【課題】基礎の天端面においてアンカーボルトが集中することを解消できる、床梁受け材と、床梁と基礎の接続構造を提供すること。【解決手段】鉄骨造の床梁50を支持しながら、基礎10に対して床梁50を接続する、床梁受け材30であり、基礎10の側面12に当接される当接片31と、当接片31の背面から基礎10側に延びて、基礎10の天端11に係止される係止片32と、当接片31の前面から基礎10と反対側に延びて床梁50を支持する支持片33とを有し、当接片31に第1ボルト孔34が開設され、第1ボルト孔34に挿通された第1ボルト41を介して側面12に当接片31が固定されるようになっており、支持片33に第2ボルト孔35が開設され、鉄骨造の床梁50の有する第3ボルト孔52と位置合わせされ、双方のボルト孔に挿通された第2ボルト42を介して支持片33と床梁50が固定されるようになっている。【選択図】図1
Bibliography:Application Number: JP20220056977