BUILDING FOUNDATION INFORMATION MANAGEMENT DEVICE, CONTROL METHOD FOR BUILDING FOUNDATION INFORMATION MANAGEMENT DEVICE, AND CONTROL PROGRAM FOR BUILDING FOUNDATION INFORMATION MANAGEMENT DEVICE

To provide a building foundation information management device, etc., which can easily and quickly revise a design drawing without re-surveying, etc., even when boundary information, etc., differs from site information, etc., at the time of construction, etc.SOLUTION: A building foundation informati...

Full description

Saved in:
Bibliographic Details
Main Author WADA KENSUKE
Format Patent
LanguageEnglish
Japanese
Published 28.07.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:To provide a building foundation information management device, etc., which can easily and quickly revise a design drawing without re-surveying, etc., even when boundary information, etc., differs from site information, etc., at the time of construction, etc.SOLUTION: A building foundation information management device 200 has a storage unit 211 for storing arrangement information for arranging a construction object and design information including boundary information of site information for arranging the construction object, wherein point information of the boundary information and the arrangement information is set as origin information, other point information is associated with coordinate information based on the origin information, and corresponding origin information and corresponding selected point information are measured for the origin information and selected point information selected from the point information, the measured corresponding origin information and corresponding selection point information are associated with coordinate information based on the origin information, the coordinate information of the origin information and the selection point information is compared with the coordinate information of the corresponding origin information and the corresponding selection point information to generate coordinate difference information, and the design information is corrected.SELECTED DRAWING: Figure 1 【課題】境界情報等が、敷地情報等と施工時等で相違した場合でも、再測量等をすることなく容易かつ迅速に設計図面を修正することができる建築基礎情報管理装置等を提供すること。【解決手段】施工対象を配置する配置情報と、施工対象を配置する敷地情報の境界情報を含む設計情報を記憶する記憶部211と、を有し、境界情報及び配置情報の地点情報を原点情報とし、他の地点情報は、原点情報を基準とする座標情報と関連付け、原点情報及び、地点情報から選択された選択地点情報に、対応原点情報及び対応選択地点情報を測定し、測定された対応原点情報と対応選択地点情報が原点情報を基準とする座標情報と関連付けられ、原点情報及び選択地点情報の座標情報と、対応原点情報及び対応選択地点情報の座標情報を比較して座標相違情報を生成し、設計情報を修正する建築基礎情報管理装置200。【選択図】図1
Bibliography:Application Number: JP20220005042