WINDOW INSTALLING METHOD, AND SCAFFOLD STRUCTURE
To provide a window installing method capable of shortening a construction period for installing a window on a building.SOLUTION: A window installing method comprises: an assembling step of assembling a window frame 4; a window frame installing step of installing the window frame 4 to an opening 1a...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
05.07.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | To provide a window installing method capable of shortening a construction period for installing a window on a building.SOLUTION: A window installing method comprises: an assembling step of assembling a window frame 4; a window frame installing step of installing the window frame 4 to an opening 1a of a building 1; and a fitting step of fitting glass shoji 5 into the window frame 4 installed to the opening 1a. The assembling step includes: a supporting step of supporting a first horizontal frame 11 by a support member 46 projecting from at least one of a first support 41 and a first handrail 44 of a scaffold structure 2 installed around the building 1 toward the building 1; a vertical frame installing step of installing vertical frames 13, 14 to the first horizontal frame 11 supported by the support member 46; and a horizontal frame installing step of installing the second horizontal frame 15 to the vertical frames 13, 14 installed on the first horizontal frame 11.SELECTED DRAWING: Figure 6
【課題】窓を建物に取り付ける工期を短くできる窓の取付方法を提供する。【解決手段】窓の取付方法は、窓枠4を組み立てる組立工程と、窓枠4を建物1の開口部1aに取り付ける窓枠取付工程と、開口部1aに取り付けられた窓枠4にガラス障子5を嵌め込む嵌込工程と、を含んでいる。上記組立工程は、建物1の周囲に設置された足場構造2の第1支柱41と第1手摺44のうちの少なくとも1つから建物1に向かって張り出す支持部材46に第1横枠11を支持させる支持工程と、支持部材46に支持された第1横枠11に縦枠13,14を取り付ける縦枠取付工程と、第1横枠11に取り付けられた縦枠13,14に第2横枠15を取り付ける横枠取付工程と、を含んでいる。【選択図】図6 |
---|---|
Bibliography: | Application Number: JP20210209936 |