HYDRAULIC DAMPER

To provide a hydraulic damper for reducing man-hours for development when setting damping force.SOLUTION: The hydraulic damper includes a piston 20 to be slidably displaced in a cylinder tube 18, a piston rod 12 to be displaced integrally with the piston 20, a piston port part 34 for communicating a...

Full description

Saved in:
Bibliographic Details
Main Authors YAMADA NOBUHIRO, OKADA YUICHI
Format Patent
LanguageEnglish
Japanese
Published 13.03.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:To provide a hydraulic damper for reducing man-hours for development when setting damping force.SOLUTION: The hydraulic damper includes a piston 20 to be slidably displaced in a cylinder tube 18, a piston rod 12 to be displaced integrally with the piston 20, a piston port part 34 for communicating a first chamber 30 and a second chamber 32 parted by the piston, with each other, a first leaf valve 50 and a second leaf valve 56 arranged downstream of the piston port part 34 where pressure oil is distributed, and a sub valve 60 arranged upstream of the first leaf valve 50 and downstream of the second leaf valve 56, the sub valve 60 being provided with a sub valve port part 76 which is communicated with a flow path of the piston port part 34. A total sum (S2) of the flow path cross section area of the sub valve port part 76 is smaller than a total sum (S1) of the flow path cross section area of the piston port part 34 (S1>S2).SELECTED DRAWING: Figure 2 【課題】減衰力を設定する際の開発工数を削減すること。【解決手段】シリンダチューブ18内を摺動変位するピストン20と、該ピストン20と一体的に変位するピストンロッド12と、ピストンによって区画される第1室30と第2室32とを連通させるピストンポート部34と、圧油が流通するピストンポート部34の下流に配置された第1リーフバルブ50及び第2リーフバルブ56と、第1リーフバルブ50の上流で、且つ、第2リーフバルブ56の下流に配置されたサブバルブ60とを備え、サブバルブ60には、ピストンポート部34の流路と連通するサブバルブポート部76が設けられ、サブバルブポート部76の流路断面積の総和(S2)は、ピストンポート部34の流路断面積の総和(S1)よりも小さい(S1>S2)。【選択図】図2
Bibliography:Application Number: JP20210140816