COMPONENT DEMAND TREND ANALYSIS SYSTEM AND METHOD
To provide a component demand trend analysis system and method that enable an accurate prediction of component demand in each base.SOLUTION: A demand trend analysis system has: an economic index acquisition device 1: a trend analysis device 2; and a plurality of base-side devices 3. The demand trend...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
06.10.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | To provide a component demand trend analysis system and method that enable an accurate prediction of component demand in each base.SOLUTION: A demand trend analysis system has: an economic index acquisition device 1: a trend analysis device 2; and a plurality of base-side devices 3. The demand trend analysis system is configured to:, in the trend analysis device 2, select economic index data related to information (component past order-acceptance data) on an order-acceptance of components in the past in each base where the base-side device 3 is installed;, in the trend analysis device 2, perform a trend analysis of future demand of the component in each base from the selected economic index data and component past order-acceptance data; and calculate recommendation amount of order-placement data and the like to be obtained by adding an analysis result to information (component order-placement schedule data) on an order-placement of component scheduled for each base.SELECTED DRAWING: Figure 1
【課題】各拠点において部品の需要を正確に予測することを可能にした部品需要傾向分析システム及び方法を提供する。【解決手段】需要傾向分析システムは、経済指標取得装置1、傾向分析装置2及び複数のの拠点側装置3を有する。拠点側装置3が設置される各拠点での部品の過去における受注に関する情報(部品過去受注データ)と関連する経済指標データを傾向分析装置2において選定し、その選定された経済指標データと、部品過去受注データとから、今後の各拠点における部品の需要の傾向分析を傾向分析装置2において行い、拠点毎に計画されている部品の発注に関する情報(部品発注予定データ)に、分析結果を付加して得られる推薦発注量データ等を算出する。【選択図】図1 |
---|---|
Bibliography: | Application Number: JP20210050987 |