HAULING SCHEME MANAGEMENT DEVICE, METHOD AND PROGRAM
To provide a hauling scheme management device capable of estimating and displaying, a land form of any time point by a simple method.SOLUTION: There is provided a hauling scheme management device comprising: a construction area data acquiring part for acquiring construction area data in which, a con...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
06.10.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | To provide a hauling scheme management device capable of estimating and displaying, a land form of any time point by a simple method.SOLUTION: There is provided a hauling scheme management device comprising: a construction area data acquiring part for acquiring construction area data in which, a construction object area is divided into a plurality of construction areas, in a two-dimensional plane diagram of the construction object area; a construction area information acquiring part for acquiring construction area information which includes, an area of each construction area, and a ground level at a first time point; a hauling data acquiring part for acquiring hauling data which includes at least, a construction period, a construction area where cutting construction is executed, a construction area in which banking construction is executed, and hauling data including a hauling amount; and a ground level estimating part for deriving a soil amount change in the construction area, between the first time point and a second time point which is at least any time point out of before and after the first time point, using the acquired hauling data, then estimating the ground level at the respective second time point in the construction area, on the basis of the derived soil amount change, the respective areas of the construction areas, and the ground level at the first time point.SELECTED DRAWING: Figure 2
【課題】簡易な手法により任意時点の地形を推定して表示すること。【解決手段】運土計画管理装置であって、施工対象領域の2次元平面図において、施工対象領域を、複数の施工エリアに区分した施工エリアデータを取得する施工エリアデータ取得部と、複数の施工エリアのそれぞれの面積と第1時点における地盤高とを含む施工エリア情報を取得する施工エリア情報取得部と、少なくとも施工時期、切土施工が行われる施工エリア、盛土施工が行われる施工エリアおよび運土量を含む運土データを取得する運土データ取得部と、取得した運土データを用いて、第1時点と第1時点の前後の少なくともいずれかの時点である第2時点との間の施工エリアのそれぞれの土量変化を導出し、導出した土量変化、取得した施工エリアのそれぞれの面積および第1時点における地盤高に基づいて、施工エリアのそれぞれの第2時点における地盤高を推定する地盤高推定部と、を備えた。【選択図】図2 |
---|---|
Bibliography: | Application Number: JP20210050895 |