To provide a low strength sand pile construction method preventing collapse of a sand pile due to excavation even in a zone where a post construction work such as excavation for a new pile construction is performed.SOLUTION: A low strength sand pile construction method comprises a I step of penetrat...
Saved in:
Main Authors | , , , , , , , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
26.09.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | To provide a low strength sand pile construction method preventing collapse of a sand pile due to excavation even in a zone where a post construction work such as excavation for a new pile construction is performed.SOLUTION: A low strength sand pile construction method comprises a I step of penetrating a hollow pipe filled with improvement material into a specific depth and a II step of discharging the improvement material in the hollow pipe by drawing the hollow pipe by an appropriate length to construct a low strength sand pile in the ground to be improved. The improvement material is a mixed material including sand pile material and solidification material, and uniaxial compressive strength of the low strength sand pile is 100 to 1,500 kN/m2.SELECTED DRAWING: None
【課題】新設杭などの掘削を行う後工事を行う区画であっても、掘削による砂杭の崩落がない低強度砂杭造成方法を提供すること。【解決手段】改良材料が充填された中空管を所定の深度まで貫入するI工程と、中空管を適宜の長さ引き抜き該中空管内の改良材料を排出するII工程とを有し、改良対象地盤中に低強度砂杭を造成する方法であって、改良材料は、砂杭材料と固化材を含む混合材料であり、該低強度砂杭の一軸圧縮強さが100~1,500kN/m2である。【選択図】なし |
---|---|
Bibliography: | Application Number: JP20210038499 |