WORK SYSTEM, CONTROL METHOD, AND PROGRAM

To provide a work system, a control method, and a program that properly determine a work plan based upon a state of a user.SOLUTION: An automatic work system comprises: acquisition means S108 for acquiring biological information on a user; generation means S109 for generating a work plan in a work a...

Full description

Saved in:
Bibliographic Details
Main Authors ITO MISAGO, SUGINO TSUKASA, HONJI MASAYA, YAMAMURA MAKOTO, KAWAI TAKAYUKI
Format Patent
LanguageEnglish
Japanese
Published 27.07.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:To provide a work system, a control method, and a program that properly determine a work plan based upon a state of a user.SOLUTION: An automatic work system comprises: acquisition means S108 for acquiring biological information on a user; generation means S109 for generating a work plan in a work area; control means S108 for controlling a work device for performing work in the work area based upon the work plan that the generation means generates; and change means S111 for changing the work plan generated by the generation means based upon the biological information that the acquisition means acquires. When the work plan generated by the generation means is changed by the change means, the control means controls an automatic working machine based upon the changed work plan.SELECTED DRAWING: Figure 6 【課題】ユーザの状態に基づいて、作業計画を適切に決定する作業システム、制御方法およびプログラムを提供する。【解決手段】自動作業システムは、ユーザの生体情報を取得する取得手段S108と、作業エリアにおける作業計画を作成する作成手段S109と、作成手段が作成した作業計画に基づいて、作業エリアにおける作業を行うための作業用デバイスを制御する制御手段S108と、取得手段が取得した生体情報に基づいて、作成手段により作成された作業計画を変更する変更手段S111と、を備える。作成手段により作成された作業計画が、変更手段により変更された場合、制御手段は、該変更された作業計画に基づいて、自動作業機を制御する。【選択図】図6
Bibliography:Application Number: JP20210004486