ELECTRIC POWER FACILITY CONTROL SYSTEM, INFORMATION PROCESSING DEVICE, ELECTRIC POWER FACILITY CONTROL METHOD, AND ELECTRIC POWER FACILITY CONTROL PROGRAM
To obtain an electric power facility control system which can appropriately start power transmission to an electric power facility.SOLUTION: An information processing device 1 of an electric power facility control system comprises: an acquisition unit 20; a determination unit 21; a power transmissio...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | English Japanese |
Published |
28.10.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | To obtain an electric power facility control system which can appropriately start power transmission to an electric power facility.SOLUTION: An information processing device 1 of an electric power facility control system comprises: an acquisition unit 20; a determination unit 21; a power transmission control unit 22; and a notification control unit 23. The acquisition unit 20 acquires position information of an operator. The determination unit 21 determines whether or not a position of the operator is in a work section on the basis of the position information acquired by the acquisition unit 20 before starting power transmission from an electric power substation to an electric power facility. The power transmission control unit 22 controls the electric power substation, starts the power transmission from the electric power substation to the electric power facility when it is determined that the position of the operator is not in the work section by the determination unit 21, and does not start the power transmission from the electric power substation to the electric power facility when it is determined that the position of the operator is in the work section by the determination unit 21. The notification control unit 23 causes a portable terminal to execute notification for warning when it is determined that the position of the operator is in the work section by the determination unit 21.SELECTED DRAWING: Figure 4
【課題】電力設備への送電を適切に開始することができる電力設備制御システムを得ること。【解決手段】電力設備制御システムの情報処理装置1は、取得部20と、判定部21と、送電制御部22と、報知制御部23とを含む。取得部20は、作業者の位置情報を取得する。判定部21は、変電所から電力設備への送電の開始前に、取得部20によって取得された位置情報に基づき、作業者の位置が作業区間内にあるか否かを判定する。送電制御部22は、判定部21によって作業者の位置が作業区間内にないと判定された場合に、変電所を制御し変電所から電力設備への送電を開始させ、判定部21によって作業者の位置が作業区間内にあると判定された場合に変電所から電力設備への送電を開始させない。報知制御部23は、判定部21によって作業者の位置が作業区間内にあると判定された場合に、携帯端末に警告のための報知を実行させる。【選択図】図4 |
---|---|
Bibliography: | Application Number: JP20200074043 |