AIR CONDITIONING SYSTEM

To actualize optimum linkage control of an outside air treatment device and an air conditioning device.SOLUTION: An air conditioning system (100) includes an outside air treatment device (10) for controlling the temperature and humidity of intake outside air to be supplied to object spaces (SP1, SP2...

Full description

Saved in:
Bibliographic Details
Main Authors OKAMOTO YASUNARI, FUJITA NAOTOSHI, TATSUMI KOJI, KAWAGISHI MASAAKI, UMASE SHINYA
Format Patent
LanguageEnglish
Japanese
Published 10.12.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:To actualize optimum linkage control of an outside air treatment device and an air conditioning device.SOLUTION: An air conditioning system (100) includes an outside air treatment device (10) for controlling the temperature and humidity of intake outside air to be supplied to object spaces (SP1, SP2), an air conditioning device (20) for controlling the temperature of air in the object spaces (SP1, SP2), and a control part (30). When one of the outside treatment device (10) and the air conditioning device (20) is in a non-temperature adjusting state of not executing the temperature adjustment of the air, the control part (30) changes the air conditioning capacity of the other of the outside air treatment device (10) and the air conditioning device (20), compared to when the outside air treatment device (10) and the air conditioning device (20) are in a temperature adjusting state of executing the temperature adjustment of the air.SELECTED DRAWING: Figure 3 【課題】外気処理装置と空気調和装置の最適な連携制御を行う。【解決手段】空調システム(100)は、取り入れた外気の温度および湿度を調整して対象空間(SP1,SP2)に給気する外気処理装置(10)と、対象空間(SP1,SP2)の空気の温度を調整する空気調和装置(20)と、制御部(30)とを備える。制御部(30)は、外気処理装置(10)および空気調和装置(20)の一方が、空気の温度調整を実行しない非温度調整状態である場合、外気処理装置(10)および空気調和装置(20)が、空気の温度調整を実行する温度調整状態である場合に比べて、外気処理装置(10)および空気調和装置(20)の他方の空調能力を変化させる。【選択図】図3
Bibliography:Application Number: JP20190102256