DEVICE EVALUATION SYSTEM AND DEVICE EVALUATION METHOD
To provide a device evaluation system and a device evaluation method capable of evaluating an air conditioner with high accuracy.SOLUTION: A device evaluation system 200 evaluates at least a first air conditioner 100A between the first air conditioner 100A and a second air conditioner 100B for perfo...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
24.09.2020
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | To provide a device evaluation system and a device evaluation method capable of evaluating an air conditioner with high accuracy.SOLUTION: A device evaluation system 200 evaluates at least a first air conditioner 100A between the first air conditioner 100A and a second air conditioner 100B for performing air conditioning of a first space. The device evaluation system includes an evaluation part 212 for evaluating the first air conditioner, and an air conditioning control part 214 for controlling the second air conditioner. The evaluation part performs first evaluation processing for evaluating the first air conditioner on the basis of a first evaluation index obtained during first operation as first operation for evaluation performed when the first air conditioner is installed, and second evaluation processing for evaluating the first air conditioner on the basis of a first evaluation index obtained during second operation as first operation for evaluation performed after the first evaluation processing. The air conditioning control part operates the second air conditioner before at least one of the first operation and the second operation, and/or during at least one of the first operation and the second operation.SELECTED DRAWING: Figure 3
【課題】精度良く空調装置を評価できる装置評価システム及び装置評価方法を提供する。【解決手段】装置評価システム200は、第1空間の空気調和を行う第1空調装置100A及び第2空調装置100Bのうち、少なくとも第1空調装置100Aを評価する。装置評価システムは、第1空調装置を評価する評価部212と、第2空調装置を制御する空調制御部214と、を備える。評価部は、第1空調装置の設置時に行われる第1評価用運転としての第1運転の際に得られる第1評価指標に基づき第1空調装置を評価する第1評価処理と、第1評価処理の後に行われる第1評価用運転としての第2運転の際に得られる第1評価指標に基づき第1空調装置を評価する第2評価処理と、を行う。空調制御部は、第1運転及び第2運転の少なくとも一方が行われる前、及び/又は、第1運転及び第2運転の少なくとも一方の実行中に、第2空調装置を運転する。【選択図】図3 |
---|---|
Bibliography: | Application Number: JP20190051639 |