METHOD AND PROGRAM FOR DETERMINING REAPING SCHEDULE

To properly determine a reaping timing of plants, improve gain and efficiently utilize a reaping facility.SOLUTION: When determining a reaping schedule of plants grown in plural fields, a vacant period of a reaping facility, growth information of plants (number of stalk, plant height, ear informatio...

Full description

Saved in:
Bibliographic Details
Main Authors KUBOTA NORIMASA, KOYANAGI YASUO
Format Patent
LanguageEnglish
Japanese
Published 07.03.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:To properly determine a reaping timing of plants, improve gain and efficiently utilize a reaping facility.SOLUTION: When determining a reaping schedule of plants grown in plural fields, a vacant period of a reaping facility, growth information of plants (number of stalk, plant height, ear information, grade or the like) and weather prediction information are taken, then based on the growth information of plants and weather prediction information, a reaping possible period for every field is predicted, then based on a vacant period of the reaping facility and reaping possible period for every field, reaping dates for plural fields are determined, then a reaping schedule indicating the reaping dates for plural fields is output. Then, when determining the reaping dates, based on at least one of an area of each field, breed, number of stalk, plant height, ear information and grade, priority for the plural fields is set, then, the reaping date is determined for the fields in the order of having higher priority in the vacant period of the reaping facility and in the reaping possible period for every field.SELECTED DRAWING: Figure 6 【課題】植物の刈り取りタイミングを適切に判断して、収益の向上を図ると共に刈り取り施設の有効利用を図る。【解決手段】複数の圃場に生育する植物の刈り取りスケジュールを決定する際に、刈り取り施設の空き期間、植物の生育情報(茎数、草丈、穂情報、等級など)、天候予測情報を取り込み、植物の生育情報と天候予測情報とに基づいて、圃場毎の刈り取り可能期間を予測し、刈り取り施設の空き期間と圃場毎の刈り取り可能期間とに基づいて、複数の圃場の刈り取り日時を決定し、複数の圃場の刈り取り日時を明示した刈り取りスケジュールを出力する。また、刈り取り日時の決定に際して、圃場の面積、品種、茎数、草丈、穂情報、等級の少なくとも1つに基づいて、複数の圃場の優先順位を設定し、優先順位が高い圃場から、刈り取り施設の空き期間内かつ当該圃場の刈り取り可能期間内で、刈り取り日時を決定する。【選択図】図6
Bibliography:Application Number: JP20170158580