FRAME INSTALLATION METHOD

PROBLEM TO BE SOLVED: To provide a frame installation method capable of reducing work time at the site (container installation site).SOLUTION: The frame installation method includes: an integrated frame manufacturing step (step S105) in which an integrated frame is assembled by combining plural sepa...

Full description

Saved in:
Bibliographic Details
Main Authors TANAKA MASAAKI, TANNO YUSUKE, SUZUKI TOMOHITO, SATO KIYOTAKA
Format Patent
LanguageEnglish
Japanese
Published 28.12.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PROBLEM TO BE SOLVED: To provide a frame installation method capable of reducing work time at the site (container installation site).SOLUTION: The frame installation method includes: an integrated frame manufacturing step (step S105) in which an integrated frame is assembled by combining plural separated component members at a place different from an installation site of a container; a carrying-in step (step S110) in which the integrated frame is carried in to the installation site of the container; and an installation step (step S115) in which the integrated frame is installed around the container by lifting the integrated frame at the container installation site.SELECTED DRAWING: Figure 6 【課題】現地(容器の設置場所)での作業時間を短縮する。【解決手段】フレームの据付方法は、容器の設置場所とは別の場所でパーツ化された複数の部材を組み合わせて1つの一体型フレームを製作する一体型フレーム製作工程(ステップS105)と、一体型フレームを容器の設置場所に搬入する搬入工程(ステップS110)と、容器の設置場所で一体型フレームを吊り上げ、吊り上げられた一体型フレームを容器の周囲に据え付ける据付工程(ステップS115)と、を備える。【選択図】図6
Bibliography:Application Number: JP20160122096