FRAME INSTALLATION METHOD
PROBLEM TO BE SOLVED: To provide a frame installation method capable of reducing work time at the site (container installation site).SOLUTION: The frame installation method includes: an integrated frame manufacturing step (step S105) in which an integrated frame is assembled by combining plural sepa...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
28.12.2017
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To provide a frame installation method capable of reducing work time at the site (container installation site).SOLUTION: The frame installation method includes: an integrated frame manufacturing step (step S105) in which an integrated frame is assembled by combining plural separated component members at a place different from an installation site of a container; a carrying-in step (step S110) in which the integrated frame is carried in to the installation site of the container; and an installation step (step S115) in which the integrated frame is installed around the container by lifting the integrated frame at the container installation site.SELECTED DRAWING: Figure 6
【課題】現地(容器の設置場所)での作業時間を短縮する。【解決手段】フレームの据付方法は、容器の設置場所とは別の場所でパーツ化された複数の部材を組み合わせて1つの一体型フレームを製作する一体型フレーム製作工程(ステップS105)と、一体型フレームを容器の設置場所に搬入する搬入工程(ステップS110)と、容器の設置場所で一体型フレームを吊り上げ、吊り上げられた一体型フレームを容器の周囲に据え付ける据付工程(ステップS115)と、を備える。【選択図】図6 |
---|---|
Bibliography: | Application Number: JP20160122096 |