SERVER RACK POWER MANAGEMENT
PROBLEM TO BE SOLVED: To provide a power management method using a rack management controller (RMC) at a server rack.SOLUTION: A power management method includes the steps of: collecting power consumption data from a first board management controller (BMC) of a first server at a server rack; transmi...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
09.11.2017
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To provide a power management method using a rack management controller (RMC) at a server rack.SOLUTION: A power management method includes the steps of: collecting power consumption data from a first board management controller (BMC) of a first server at a server rack; transmitting the power consumption data to a management server; receiving a power request, by a rack management controller, from the management server, and determining power setting on the basis of the power consumption data and the power request; and requesting, by the rack management controller, the first board management controller to limit power consumption of the first server according to the power setting.SELECTED DRAWING: Figure 1
【課題】サーバラックにおけるラック管理コントローラ(RMC)による電力管理方法を提供する。【解決手段】サーバラックにおける第1サーバの第1基板管理コントローラ(BMC)から電力消費データを収集するステップと、電力消費データを管理サーバへ送信するステップと、ラック管理コントローラは管理サーバから電力要求を受信して、電力消費データ及び電力要求に基づいて電力設定を決定するステップと、ラック管理コントローラは、電力設定に応じて第1サーバの電力消費を制限するよう第1基板管理コントローラに要求するステップとを含む。【選択図】図1 |
---|---|
Bibliography: | Application Number: JP20170088697 |