POST-CONSTRUCTION ANCHOR AND INSTALLATION METHOD OF INSTALLATION OBJECT

PROBLEM TO BE SOLVED: To provide a post-construction anchor capable of preventing looseness of a screw and preventing slipping-out of a bolt at low cost.SOLUTION: A post-construction anchor 1 is constituted of an interior body 2 having a female screw part 21 extending in the axial direction and an e...

Full description

Saved in:
Bibliographic Details
Main Authors JOGAN MASAHIKO, KUBOTA YOICHI
Format Patent
LanguageEnglish
Japanese
Published 10.08.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PROBLEM TO BE SOLVED: To provide a post-construction anchor capable of preventing looseness of a screw and preventing slipping-out of a bolt at low cost.SOLUTION: A post-construction anchor 1 is constituted of an interior body 2 having a female screw part 21 extending in the axial direction and an expansive opening member 3 for internally facing the interior body 2 from the tip side and expansively opening in the radial direction by relative press-in of the interior body 2, in which the female screw part 21 is formed up to a tip part 22 of the interior body 2, and a screw groove of the female screw part 21 corresponding to the tip part 22 is deformably formed, and suitably, a caulking part 23 of a crushed shape is formed in a predetermined place of the outer periphery of the tip part 22 so as to deform the screw groove of the tip part 22.SELECTED DRAWING: Figure 3 【課題】低コストでねじの緩み止め、ボルトの抜け出しを防止することができるあと施工アンカーを提供する。【解決手段】軸方向に延びる雌ねじ部21を有する内装体2と、内装体2が先端側から内装され、内装体2の相対的な圧入によって径方向に拡開する拡開部材3とから構成され、雌ねじ部21が内装体2の先端部22まで形成され、先端部22に対応する雌ねじ部21のねじ溝が変形して形成されているあと施工アンカー1であり、好適には先端部22のねじ溝が変形するようにして先端部22の外周の所定箇所に押し潰した形状のカシメ部23を形成する。【選択図】図3
Bibliography:Application Number: JP20160020565