SUPPORT SYSTEM FOR REINFORCING BAR ARRANGEMENT WORK, METHOD FOR SUPPORTING REINFORCING BAR ARRANGEMENT WORK, AND PROGRAM FOR SUPPORTING REINFORCING BAR ARRANGEMENT WORK
PROBLEM TO BE SOLVED: To enable a reinforcing bar arrangement worker to appropriately perform preparation work suited to a structure of a building member used in a work section following a present work section.SOLUTION: A support system 1 for reinforcing bar arrangement work includes: a work object...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
20.06.2016
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To enable a reinforcing bar arrangement worker to appropriately perform preparation work suited to a structure of a building member used in a work section following a present work section.SOLUTION: A support system 1 for reinforcing bar arrangement work includes: a work object specification part 32 that specifies a building member and a section to be worked in reinforcing bar arrangement work of reinforcing bar installation work; a comparison part 33 that compares between a structure of the building member to be worked in the present section and a structure of the building member to be worked in a section following the present section or a structure of the building member installed continuously from the structure or the building member of the present section, referring to structural information of each building member extracted from a construction drawing; and an output part 38 that outputs information showing a result of the comparison.SELECTED DRAWING: Figure 6
【課題】鉄筋工事の配筋作業の作業者等が、現在作業中の工区の次の工区における建築部材の構造に対応した仕込み作業を適切に行うことができるようにする。【解決手段】配筋作業支援システム1が、次の構成を備える。すなわち、鉄筋工事の配筋作業における作業対象の建築部材及び作業対象の工区を特定する対象特定部32と、建築施工図から抽出された、各建築部材の構造情報を参照して、作業対象の工区における作業対象の建築部材の構造と、当該作業対象の工区の次の工区における当該作業対象の建築部材の構造又は当該建築部材と連続して配置される建築部材の構造との比較を行う比較部33と、比較を行なった結果を示す情報を出力する出力部38とを備える。【選択図】図6 |
---|---|
Bibliography: | Application Number: JP20140248095 |