CONSTRUCTION METHOD FOR PIER, AND STEEL PIPE CAP
PROBLEM TO BE SOLVED: To provide a construction method for a pier, which enables early construction, and a steel pipe cap for use in the same.SOLUTION: A construction method for a pier includes the steps of: arranging a steel pipe pile 2 in the ground; fixing a steel pipe cap 10 to a head of the ste...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
24.08.2015
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To provide a construction method for a pier, which enables early construction, and a steel pipe cap for use in the same.SOLUTION: A construction method for a pier includes the steps of: arranging a steel pipe pile 2 in the ground; fixing a steel pipe cap 10 to a head of the steel pipe pile 2; placing a stringer 3 on the steel pipe cap 10; and placing foot protection concrete 6 for the steel pipe pile 2. In the steel pipe cap 10, a through-hole 13 communicating with an inner space of the steel pipe pile 2 is formed in a position to avoid the stringer 3. The foot protection concrete 6 is placed on a lower end of the steel pipe pile 2 by utilizing the through-hole 13.
【課題】早期施工を可能とした桟橋の施工方法およびこれに使用する鋼管キャップを提供する。【解決手段】鋼管杭2を地中に配設する工程と、鋼管杭2の頭部に鋼管キャップ10を固定する工程と、鋼管キャップ10上に桁材3を載置する工程と、鋼管杭2の根固めコンクリート6を打設する工程とを備える桟橋の施工方法であって、鋼管キャップ10には、桁材3を避けた位置に、鋼管杭2の内空に通じる貫通孔13が形成されており、根固めコンクリート6は、貫通孔13を利用して鋼管杭2の下端部に打設する。【選択図】図3 |
---|---|
Bibliography: | Application Number: JP20140027528 |