FORM STRUCTURE
PROBLEM TO BE SOLVED: To provide a form structure which can be efficiently assembled in a short period of time, can be inexpensively assembled without a time and labor, and can sufficiently withstand the side pressure of concrete to be placed.SOLUTION: A form structure 10A is formed of: angle bars 4...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | English |
Published |
02.10.2014
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To provide a form structure which can be efficiently assembled in a short period of time, can be inexpensively assembled without a time and labor, and can sufficiently withstand the side pressure of concrete to be placed.SOLUTION: A form structure 10A is formed of: angle bars 43a and 43b installed in first and second fixing positions 28 and 30; a plurality of form panels 16a to 16i installed between the first and fixing positions; a plurality of truss structures 17a to 17i installed at the front in the longitudinal direction of a panel, and extending in the vertical direction; a plurality of horizontal erection materials 18a to 18c installed at the truss structures 17a to 17i while being located at the front in longitudinal directions of the truss structures 17a to 17i, and extending in horizontal directions; and a plurality of support erection materials 19a to 19c installed at the front in longitudinal directions of the horizontal erection materials 18a to 18c, and horizontally aligned at intervals of prescribed dimensions. |
---|---|
Bibliography: | Application Number: JP20130060001 |