FLEXIBLE JOINT FORMATION METHOD FOR CONCRETE BOX BODY
PROBLEM TO BE SOLVED: To provide a flexible joint formation method for a concrete box body, which easily can secure a joint between the concrete box bodies, even when a reaction force of jack thrust is received.SOLUTION: A concrete box body 4 includes right and left side wall panels and upper and lo...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
21.08.2014
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To provide a flexible joint formation method for a concrete box body, which easily can secure a joint between the concrete box bodies, even when a reaction force of jack thrust is received.SOLUTION: A concrete box body 4 includes right and left side wall panels and upper and lower floor panels, and front and rear end surfaces are opened as openings. The concrete box bodies 4 are arranged in file to receive a reaction force of jack thrust. A gap holding material plate 15 is arranged between end surfaces of the concrete box bodies, so that the concrete box bodies 4 can be arranged. The gap holding material plate 15 is extracted from the inside of the concrete box body 4 later. |
---|---|
Bibliography: | Application Number: JP20130016502 |