PLANT MONITORING SYSTEM AND RENEWING METHOD THEREFOR
PROBLEM TO BE SOLVED: To reduce a plant operation outage period on the occasion of a plant monitoring system renewal test.SOLUTION: A plant monitoring system comprises: a first computer group 11; a first operation side network 13; a first apparatus side network 12; a second computer group 21; a seco...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
17.03.2014
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To reduce a plant operation outage period on the occasion of a plant monitoring system renewal test.SOLUTION: A plant monitoring system comprises: a first computer group 11; a first operation side network 13; a first apparatus side network 12; a second computer group 21; a second operation side network 23; a second apparatus side network 22; a plant data branching device 5; an apparatus side plant data input output device 2; and a condition data determination device 100a. The condition data determination device 100a includes: a first and a second condition data reception processing units which receive processed condition data from the first computer group 11 and the second computer group 21 respectively; and a condition data comparison check unit which performs a comparison test of the processed condition data received by the first and the second condition data reception processing units. |
---|---|
Bibliography: | Application Number: JP20120189055 |