REINFORCING MATERIAL MIXED UNDERGROUND CONTINUOUS WALL AND CONSTRUCTION METHOD THEREFOR

PROBLEM TO BE SOLVED: To provide a reinforcing material mixed underground continuous wall capable of being easily and inexpensively constructed and a reinforcing material mixed underground continuous wall capable of being expensively and highly strongly constructed, and to provide a construction met...

Full description

Saved in:
Bibliographic Details
Main Authors SAKAGUCHI TAIYO, TSURUYAMA NOBORU, HAZAMA AKINORI, YAMAMOTO YASUHIRO, TAKAHASHI KEISUKE
Format Patent
LanguageEnglish
Published 11.04.2013
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PROBLEM TO BE SOLVED: To provide a reinforcing material mixed underground continuous wall capable of being easily and inexpensively constructed and a reinforcing material mixed underground continuous wall capable of being expensively and highly strongly constructed, and to provide a construction method for the reinforcing material mixed underground continuous walls.SOLUTION: A reinforcing material mixed underground continuous wall 50 includes geotextiles embedded in a ground in an approximately vertical direction. The geotextiles are cylindrical bodies 51 having openings in the vertical direction. The plurality of cylindrical bodies 51 are arranged side by side in a horizontal direction while internally constraining part of soil.
Bibliography:Application Number: JP20120264610