SYSTEM FOR PERFORMING CHARGE/DISCHARGE TEST OF ELECTRICITY STORAGE DEVICE

PROBLEM TO BE SOLVED: To obtain accurate measurement data in a charge/discharge test performed over a long time, and moreover, to obtain accurate detailed data of a transient region in switching between modes of charge, discharge, and suspension by simplifying the system configuration. SOLUTION: A c...

Full description

Saved in:
Bibliographic Details
Main Authors IINUMA KAZUTAKA, MOROTOMI JUNPEI
Format Patent
LanguageEnglish
Published 20.05.2010
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PROBLEM TO BE SOLVED: To obtain accurate measurement data in a charge/discharge test performed over a long time, and moreover, to obtain accurate detailed data of a transient region in switching between modes of charge, discharge, and suspension by simplifying the system configuration. SOLUTION: A control CPU 31 performs high-speed sampling of charge/discharge current and voltage detection signals and converts them into pieces of digital data by an AD converter and obtains these pieces of digital data for only a preset fixed period, in the vicinity of a transient region. In parallel with the acquisition, by having the CPU obtain digital data, while performing its thinning with respect to digital data ranging over a long time; associate these pieces of digital data with each other, by adding the same timing information to the pieces of data, respectively; and transmits the data to a computer 100 side via the Ethernet(R) at a high speed. Based on the timing information added to the transmitted digital data, the computer obtains the pieces of digital data that are associated with one another. COPYRIGHT: (C)2010,JPO&INPIT
Bibliography:Application Number: JP20080283824