MUD FILLING STRUCTURE AND MUD FILLING METHOD
PROBLEM TO BE SOLVED: To provide a mud filling structure and a mud filling method by which a molten pig iron tapping hole can be closed while efficiently repairing the molten pig iron tapping hole. SOLUTION: The hard mud A and a soft mud B used for repairing are prepared, and the mud A and the B are...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | English |
Published |
26.04.2007
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To provide a mud filling structure and a mud filling method by which a molten pig iron tapping hole can be closed while efficiently repairing the molten pig iron tapping hole. SOLUTION: The hard mud A and a soft mud B used for repairing are prepared, and the mud A and the B are alternately charged into a cylinder 2, wherein the mud A is arranged at the top end part (nozzle side) and the tail end part (piston side). The molten pig iron tapping hole 5 is closed by alternately charging two kinds of muds A, B into the molten pig iron tapping hole 5 by using a mud-gun 1 filled in such way. COPYRIGHT: (C)2007,JPO&INPIT |
---|---|
Bibliography: | Application Number: JP20050299118 |