TUNDISH FOR CONTINUOUS CASTING
PROBLEM TO BE SOLVED: To sufficiently separate and remove fine inclusions of not more than 100 μm in molten steel. SOLUTION: In a tundish 1 for continuous casting, an upper bank 20 and a lower bank 21 are installed in a molten steel path F between a pouring nozzle 10 of molten steel M from a ladle 1...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | English |
Published |
12.04.2007
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To sufficiently separate and remove fine inclusions of not more than 100 μm in molten steel. SOLUTION: In a tundish 1 for continuous casting, an upper bank 20 and a lower bank 21 are installed in a molten steel path F between a pouring nozzle 10 of molten steel M from a ladle 11 and an outlet 12 of molten steel M to a mold. The upper bank 20 and the lower bank 21 are arranged upward and downward at the same position in the molten steel path F. A slit 22 through which the molten steel M flows is formed between the upper bank 20 and the lower bank 21. An opening area of the slit 22 is set so as to be 20% and less of a cross section area of the maximum molten steel flowing path which corresponds to the highest molten steel surface level. COPYRIGHT: (C)2007,JPO&INPIT |
---|---|
Bibliography: | Application Number: JP20050287135 |