EXCEPTION HANDLING IN MANUFACTURING SYSTEM COMBINING ON-LINE PLANNING AND PREDETERMINED RULE
PROBLEM TO BE SOLVED: To provide a method for performing exception handling within a computer controlled multi-step production system for producing objects. SOLUTION: The system includes a system controller. The system controller receives a stream of object specifications for objects to be produced....
Saved in:
Main Authors | , , , , |
---|---|
Format | Patent |
Language | English |
Published |
08.12.2005
|
Edition | 7 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To provide a method for performing exception handling within a computer controlled multi-step production system for producing objects. SOLUTION: The system includes a system controller. The system controller receives a stream of object specifications for objects to be produced. A planner/scheduler plans and schedules jobs incrementally and the system controller sends commands to a module controller directing production of the planned and scheduled objects by production system modules. COPYRIGHT: (C)2006,JPO&NCIPI |
---|---|
Bibliography: | Application Number: JP20050147783 |