HIGH VOID SUBGRADE MATERIAL AND SEMI-RIGID SUBGRADE CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a high void subgrade material contributed to the improvement of riding in a railway track, the reduction of maintenance work, the facility of use in a road, a park, various kinds of athletic equipments, etc. and a semi-rigid subgrade construction method. SOLUTION: Th...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
02.12.2004
|
Edition | 7 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To provide a high void subgrade material contributed to the improvement of riding in a railway track, the reduction of maintenance work, the facility of use in a road, a park, various kinds of athletic equipments, etc. and a semi-rigid subgrade construction method. SOLUTION: The subgrade material having water-granulated slag, cement and fly ash as main components mixed with silicon dioxide, aluminum oxide and magnesium oxide is manufactured, the subgrade material is laid and leveled to a set height, and a proper amount of water is sprayed thereon to solidify to lightly roll on. COPYRIGHT: (C)2005,JPO&NCIPI |
---|---|
Bibliography: | Application Number: JP20030137336 |