HIGH VOID SUBGRADE MATERIAL AND SEMI-RIGID SUBGRADE CONSTRUCTION METHOD

PROBLEM TO BE SOLVED: To provide a high void subgrade material contributed to the improvement of riding in a railway track, the reduction of maintenance work, the facility of use in a road, a park, various kinds of athletic equipments, etc. and a semi-rigid subgrade construction method. SOLUTION: Th...

Full description

Saved in:
Bibliographic Details
Main Authors TSUKUDA TAKAARI, DOI HIROMI, HANAWA SHIYOUTARO
Format Patent
LanguageEnglish
Published 02.12.2004
Edition7
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PROBLEM TO BE SOLVED: To provide a high void subgrade material contributed to the improvement of riding in a railway track, the reduction of maintenance work, the facility of use in a road, a park, various kinds of athletic equipments, etc. and a semi-rigid subgrade construction method. SOLUTION: The subgrade material having water-granulated slag, cement and fly ash as main components mixed with silicon dioxide, aluminum oxide and magnesium oxide is manufactured, the subgrade material is laid and leveled to a set height, and a proper amount of water is sprayed thereon to solidify to lightly roll on. COPYRIGHT: (C)2005,JPO&NCIPI
Bibliography:Application Number: JP20030137336