GAS FITTING WORK MANAGEMENT SYSTEM
PROBLEM TO BE SOLVED: To manage progress of each work by data processing of a computer when accepting the work of inspection, replacement or repair of a device related to gas fitting of a house. SOLUTION: This gas fitting work management system has: a work registration means 2 newly registering the...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | English |
Published |
21.10.2004
|
Edition | 7 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To manage progress of each work by data processing of a computer when accepting the work of inspection, replacement or repair of a device related to gas fitting of a house. SOLUTION: This gas fitting work management system has: a work registration means 2 newly registering the accepted work into a work item table 11 in dwelling unit units; a work request means 3 registering a work progress state of the work item table 11 as an item during work by order placement process data transmission and order reception confirmation data reception with a gas fitter terminal 8 of a designated gas fitter subcontracting the work; and an additional registration means 4 registering additional work to the work item table 11 on the basis of inspection result data received from the gas fitter terminal 8 of the designated work dealer requested with the inspection. When a change of the designated gas fitter requested with the additional work is absent, the additional registration means 4 updates the work item table 11 with a progress state of the additional work as the item during the work or an item during the request. When the change is present, the additional registration means 4 newly registers the progress state into the work item table 11 as the item during the request. COPYRIGHT: (C)2005,JPO&NCIPI |
---|---|
Bibliography: | Application Number: JP20030084271 |