LINING CONSTRUCTION METHOD IN DUCT

PROBLEM TO BE SOLVED: To provide a lining construction method in a duct that is able to obtain a uniformly-thick lining layer across the whole duct internal area regardless of an elongated condition of a duct channel and a different inner diameter without causing a liquid drop if a low-viscosity lin...

Full description

Saved in:
Bibliographic Details
Main Authors YAGI SHUICHI, SHIMIZU SEITA
Format Patent
LanguageEnglish
Published 05.11.2002
Edition7
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PROBLEM TO BE SOLVED: To provide a lining construction method in a duct that is able to obtain a uniformly-thick lining layer across the whole duct internal area regardless of an elongated condition of a duct channel and a different inner diameter without causing a liquid drop if a low-viscosity lining agent is used. SOLUTION: In such a lining construction method that is targeted to the inside of the duct, with a lining execution zone of the above duct channel as a target, the method is characterized in that a lining layer C is formed by circulating a low viscosity lining agent inside the duct.
Bibliography:Application Number: JP20010126089