LINING CONSTRUCTION METHOD IN DUCT
PROBLEM TO BE SOLVED: To provide a lining construction method in a duct that is able to obtain a uniformly-thick lining layer across the whole duct internal area regardless of an elongated condition of a duct channel and a different inner diameter without causing a liquid drop if a low-viscosity lin...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English |
Published |
05.11.2002
|
Edition | 7 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To provide a lining construction method in a duct that is able to obtain a uniformly-thick lining layer across the whole duct internal area regardless of an elongated condition of a duct channel and a different inner diameter without causing a liquid drop if a low-viscosity lining agent is used. SOLUTION: In such a lining construction method that is targeted to the inside of the duct, with a lining execution zone of the above duct channel as a target, the method is characterized in that a lining layer C is formed by circulating a low viscosity lining agent inside the duct. |
---|---|
Bibliography: | Application Number: JP20010126089 |