PILE CONSTRUCTION METHOD

PROBLEM TO BE SOLVED: To surely anchor a steel pipe at a predetermined depth by avoiding a jamming phenomenon in the sandy soil ground containing small water content and being homogeneous in particle size, and preventing retaining of the steel pipe at a high level, in a method of constructing soil c...

Full description

Saved in:
Bibliographic Details
Main Author HORIKIRI SETSU
Format Patent
LanguageEnglish
Published 31.08.2001
Edition7
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PROBLEM TO BE SOLVED: To surely anchor a steel pipe at a predetermined depth by avoiding a jamming phenomenon in the sandy soil ground containing small water content and being homogeneous in particle size, and preventing retaining of the steel pipe at a high level, in a method of constructing soil cement composite piles by agitating and excavating the ground and settling the steel pipes. SOLUTION: Excavation of the ground is carried out by an excavator 4, and a non-ionic soluble cellulose ether compound is added to a hardening liquid discharged from the excavator 4 when the steel pipes 1 are anchored. The compound has the viscosity of 25,000 to 35,000 mPa.s measured by the Brookfield type viscometer at a temperature of 20 deg.C provided that the hardening liquid is a 2% aqueous solution.
Bibliography:Application Number: JP20000044171