UNEVENNESS REPAIRING METHOD IN SLOPE STABILITY METHOD AND HOLDING FRAME

PROBLEM TO BE SOLVED: To promote certainty of unevenness repairing work. SOLUTION: A form cloth 18 larger than a plane outward form of a pressure construction capable of ensuring a turnable piece 18a on the overall circumference along the circumferential surface of the pressure construction 12 is la...

Full description

Saved in:
Bibliographic Details
Main Authors FUKAI MASAYOSHI, HASHIMOTO AKIRA
Format Patent
LanguageEnglish
Published 17.10.2000
Edition7
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PROBLEM TO BE SOLVED: To promote certainty of unevenness repairing work. SOLUTION: A form cloth 18 larger than a plane outward form of a pressure construction capable of ensuring a turnable piece 18a on the overall circumference along the circumferential surface of the pressure construction 12 is laid along a slope 14 every permanent anchor 10. After the installation of the pressure construction 12 piled on the form cloth 18, the turnable piece 18a of the turnable form cloth is adhered and fixed to the circumferential surface of the pressure construction with beam holding frames 44 and outside holding frames 46, and a space between the lower surface of the pressure construction and the form cloth 18 is filled with cement milk (grout) 16 to repair an unevenness part under the pressure construction.
Bibliography:Application Number: JP19990104713