PRODUCTION PLAN PLANNING METHOD
PROBLEM TO BE SOLVED: To make the improvement of planning precision and the shortening of calculation time needed for planning a plan compatible, in a method which plans a production plan for producing a necessary number of products for every operation day in a producing process of the products as o...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
14.03.2000
|
Edition | 7 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To make the improvement of planning precision and the shortening of calculation time needed for planning a plan compatible, in a method which plans a production plan for producing a necessary number of products for every operation day in a producing process of the products as of a production planning object period from a reference operation day toward the future. SOLUTION: While a shipment plan as a production plan is planned by an 'article' system wherein the shipment times of respective products (shown with circle marks in figure) are related to the individual products as of a 1st period when a production planning object period (June 1 to 9) is divided into a past-side 1st period and a future-side 2nd period, a shipment plan is planned by a 'quantity' system representing the shipment plan as the quantity of products shipped on the same operation day as of the 2nd period. |
---|---|
Bibliography: | Application Number: JP19980245625 |