More Information
Summary:A method of placing a flowable construction matexial comprising a hydraulic binder for building structural components layer-by-layer, such as for 3D concrete printing, said method comprising: preparing a fresh flowable construction material made of Portland cement, fine limestone filler materials, fine sands, water, and water reducing admixture and possibly a set or hardening accelerating admixture, conveying the flowable construction material to a deposition head (10), placing the construction material through an outlet of the deposition head (10) in order to form a layer of construction material, before placing the construction material, adding a rheology-modifying agent to the construction material so that the placed material has an increased yield stress when compared to the material during the conveying step.
Bibliography:Application Number: HR2019P001702T