DEDICATED BEARER CREATION METHOD AND MOBILITY MANAGEMENT ENTITY
A dedicated bearer creation method, an MME, and a PDN gateway are provided. The dedicated bearer creation method includes: in a TAU procedure, when it is determined that a UE has moved from a 5G network to a 4G network based on identification information provided by the UE, keeping a control plane N...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | English French German |
Published |
26.07.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A dedicated bearer creation method, an MME, and a PDN gateway are provided. The dedicated bearer creation method includes: in a TAU procedure, when it is determined that a UE has moved from a 5G network to a 4G network based on identification information provided by the UE, keeping a control plane NAS connection after the TAU procedure; and when a create dedicated bearer request has been received from a PDN gateway, creating a dedicated bearer for the UE using the NAS connection. According to the present disclosure, it is able to create a radio bearer based on the practical need, and prevent the occurrence of a waste of air interface resources caused when the MME requests an eNB to create a user plane radio bearer in the TAU procedure, thereby to solve the problem in the related art where the waste of the air interface resources is caused by a dedicated bearer creation scheme. |
---|---|
Bibliography: | Application Number: EP20180880786 |