SYSTEM AND METHOD FOR RE-FRACTURING MULTIZONE HORIZONTAL WELLBORES
A packer on a tubing string and diverting material pumped down the tubing string may be used to isolate a fracture cluster in a multizone horizontal wellbore that has been previously hydraulically fractured. Once hydraulically isolated, fluid may be pumped down the tubing string to re-fracture the p...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English French German |
Published |
05.10.2016
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A packer on a tubing string and diverting material pumped down the tubing string may be used to isolate a fracture cluster in a multizone horizontal wellbore that has been previously hydraulically fractured. Once hydraulically isolated, fluid may be pumped down the tubing string to re-fracture the previously fractured fracture cluster in an effort to increase hydrocarbon production from the horizontal wellbore. The tubing string may include a testing device used to determine whether a specific fracture cluster within the horizontal wellbore should be re-fractured. Diverting material may be pumped down the tubing string and positioned adjacent a fracture cluster to hydraulically isolate the fracture cluster during the re-fracturing process. The diverting material may be cleaned out of the horizontal wellbore after all desired fracture clusters along the horizontal wellbore have been individually re-fractured. |
---|---|
Bibliography: | Application Number: EP20140866378 |