POWER MANAGEMENT CONTROL SYSTEM FOR NATURAL ENERGY POWER GENERATION SYSTEM PROVIDED WITH STORAGE BATTERY

When power management processing is started (S101), it is determined whether setting of calculation of a power generation output upper limit target candidate value is automatic or manual (S102). When it is not automatic calculation, the power generation output upper limit target candidate value is i...

Full description

Saved in:
Bibliographic Details
Main Authors BANDO, Matsuo, KITAMURA, Takeshi
Format Patent
LanguageEnglish
French
German
Published 29.04.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:When power management processing is started (S101), it is determined whether setting of calculation of a power generation output upper limit target candidate value is automatic or manual (S102). When it is not automatic calculation, the power generation output upper limit target candidate value is inputted (S103), and in the case of automatic calculation, the power generation output upper limit target candidate value is calculated (S104). Next, the power generation output upper limit target candidate value and a generator rated output are compared, and it is determined whether the power generation output upper limit target candidate value < generator rated output (S105). If the comparison result is YES, the power generation output upper limit target value is set so that the power generation output upper limit target value = the power generation output upper limit target candidate value (S106). Next, control of regulating generation power of a natural energy power generation apparatus is performed so that a power generation output value is close to the set power generation output upper limit target value (S107). Thereby, in a natural energy power generation system with a storage battery, a storage battery can be reduced in capacity.
Bibliography:Application Number: EP20080879107