METHOD FOR MANUFACTURING HUB UNIT AND HUB UNIT

In a state in which a first ball 103 is assembled in between a first inner peripheral raceway surface of an outer ring 105 and an outer peripheral raceway surface of a shaft 101, and a second ball 104 is placed in between a second inner peripheral raceway surface of the outer ring 105 and an outer p...

Full description

Saved in:
Bibliographic Details
Main Authors OHTANI, YASUHIRO, MIURA, HIROYUKI, MURATA, EIJI, YOSHIKAWA, HIROSHI, TOMITA, DAISAKU
Format Patent
LanguageEnglish
French
German
Published 08.10.2008
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:In a state in which a first ball 103 is assembled in between a first inner peripheral raceway surface of an outer ring 105 and an outer peripheral raceway surface of a shaft 101, and a second ball 104 is placed in between a second inner peripheral raceway surface of the outer ring 105 and an outer peripheral surface of the shaft 101, a first distance "a" from a plane "q" generally perpendicular to a central axis "p" of the shaft 101 to the second ball 104 and a second distance "b" from the plane "q" to a stepped portion 107 of the shaft 101 are measured. Then, the size in the axial direction of the inner ring 102 is adjusted on the basis of a difference between the first distance "a" and the second distance "b".
Bibliography:Application Number: EP20070706965