DE2833277

The present stress in the turbine rotor is estimated at each control period, from the steam temperature and pressure at the turbine inlet. In addition, the future turbine inlet steam temperature or pressure is preestimated once every nT control cycles, for a given speed or load changing rate, making...

Full description

Saved in:
Bibliographic Details
Main Authors HISANO, KATSUKUNI, NAKANO, YOSHIYUKI, OTAWARA, YASUHIKO, KATSUTA, KATO, FUMIO, FUKUSHIMA, KOICHIRO, MATSUMOTO, HIROSHI, TENNICHI, YASUHIRO, MATSUMURA, JUBE, SATO, YOSHIO, KAWANO, SHIGEYOSHI, HITACHIOTA, KASHIWAHARA, KATSUTO, HIGASHI, TOSHIHIKO
Format Patent
LanguageEnglish
Published 06.11.1980
Edition3
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The present stress in the turbine rotor is estimated at each control period, from the steam temperature and pressure at the turbine inlet. In addition, the future turbine inlet steam temperature or pressure is preestimated once every nT control cycles, for a given speed or load changing rate, making use of data concerning the changing rate of the turbine steam inlet temperature or pressure in relation with the change of the speed or load, which has been obtained by a learning of the past turbine operating condition. This future steam temperature or pressure at the turbine inlet is used as a factor for preestimating the future stress expected to be caused in the turbine rotor. The preestimation of the rotor stress is performed for a plurality of assumed speed or load changing rates. The turbine is controlled at the maximum speed increase-rate or load changing rate which would not cause the future stress preestimated over a given preestimation time to exceed a limit stress. An observation of the present stress is made at each control period to check whether the limit stress is not exceeded by the present stress.
Bibliography:Application Number: DE19782833277