High-rise structure concreting system - has pipe to jib taken via slewing compensation device in crane tower

The system is for concreting high rise structures, erected by means of climbing cranes. The crane tower, mounted on a baseplate, is enclosed by its own and a baseplate slewing ring, the two being spaced apart. In the working position, a derricking concreting jib extends obliquely upwards from the ba...

Full description

Saved in:
Bibliographic Details
Main Author SCHNEIDER,HERMANN
Format Patent
LanguageEnglish
German
Published 23.08.1979
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The system is for concreting high rise structures, erected by means of climbing cranes. The crane tower, mounted on a baseplate, is enclosed by its own and a baseplate slewing ring, the two being spaced apart. In the working position, a derricking concreting jib extends obliquely upwards from the baseplate slewing ring, being supported by derricking ropes etc. from the tower and equipped with a concrete supply pipe. In the tower the concrete pipe is taken to a device allowing slewing movement and fixed to the tower. The device is actuated by a connecting pipe leading to the section of concrete pipe on the concreting jib itself.
Bibliography:Application Number: DE19782805849