Heizkesselanlage und Verfahren zu deren Betrieb
Boiler equipment comprising a coal fired boiler (1), a regenerative air pre-heater (2), equipped with a heat transfer section (2a), for preheating air (A1) from the outside and feeding the preheated air (A1) as combustion air (A2) to the coal fired boiler (1), and a dry clinker conveyor (3) for conv...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | German |
Published |
20.01.2011
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Boiler equipment comprising a coal fired boiler (1), a regenerative air pre-heater (2), equipped with a heat transfer section (2a), for preheating air (A1) from the outside and feeding the preheated air (A1) as combustion air (A2) to the coal fired boiler (1), and a dry clinker conveyor (3) for conveying ash (B) discharged from the coal fired boiler (1) while cooling the ash (B) with cooling air (A4) introduced externally is further provided with a by-path (13) for feeding a part of the combustion air (A2) being fed from the regenerative air pre-heater (2) to the coal fired boiler (1) as cooling medium (A6) to the dry clinker conveyor (3) in order to enhance efficiency of the regenerative air pre-heater (2). |
---|---|
Bibliography: | Application Number: DE20091100570T |