Bridge transformation structure of overpass newly-built railway
The utility model discloses a bridge transformation structure of an overpass newly-built railway. Comprising a newly-built bridge section, the newly-built bridge section is supported through a newly-built supporting foundation and overpasses a newly-built railway, one end of the newly-built bridge s...
Saved in:
Main Authors | , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
16.08.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The utility model discloses a bridge transformation structure of an overpass newly-built railway. Comprising a newly-built bridge section, the newly-built bridge section is supported through a newly-built supporting foundation and overpasses a newly-built railway, one end of the newly-built bridge section is connected with an existing bridge section, and the other end of the newly-built bridge section extends to a newly-built side slope beside the newly-built railway. The original bridge section is lengthened by arranging the newly-built bridge section, laying of the newly-built railway can be met, the problems of time and capital cost confronted by the situation that the newly-built railway is crossed with the existing bridge section are solved, the existing bridge section is lengthened on the premise that the existing bridge section is reserved, and the construction period and investment are effectively saved.
本实用新型公开了一种上跨新建铁路的桥梁改造结构;包括新建桥段,所述新建桥段通过新建支撑基础支撑并且上跨新建铁路,所述新建桥段的一端与既有桥段接驳,所述新建桥段的另一端延伸至新建铁路旁的新建边坡上。 |
---|---|
Bibliography: | Application Number: CN202322853094U |