Concrete tower drum installation construction device
The utility model relates to the technical field of tower drum installation and construction, in particular to a concrete tower drum installation and construction device which comprises a checkered plate platform, a duct piece coaxiality measuring instrument is arranged in the middle of the checkere...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
09.02.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The utility model relates to the technical field of tower drum installation and construction, in particular to a concrete tower drum installation and construction device which comprises a checkered plate platform, a duct piece coaxiality measuring instrument is arranged in the middle of the checkered plate platform, a plurality of slidable operation platforms are detachably installed outside the checkered plate platform, and the slidable operation platforms are arranged in an annular array mode. The checkered plate platform comprises an annular platform and a connecting platform, the front end and the rear end of the connecting platform are fixedly installed on the annular platform, handrails are fixedly installed on the left side and the right side of the upper end of the connecting platform, and I-shaped steel supporting frameworks are fixedly installed at the left end and the right end of the connecting platform. The ends, away from the connecting platform, of the two I-shaped steel supporting frameworks a |
---|---|
Bibliography: | Application Number: CN202321826784U |